University of Sheffield
ENGINEERIN 01
Rowan Woodhead Engineering Project AMEDK3-004 Rowan Woodhead Engineering Project 2020-2021 Abstract – Storeroom Cleaning The project that this report covers was undertaken at Samworth Brothers Manton Wood and was completed by Rowan Woodhead with the assistance of colleague apprentice Jack Bedford and Engineering Maintenance Manager Dani
...[Show More]
Rowan Woodhead Engineering Project AMEDK3-004 Rowan Woodhead Engineering Project 2020-2021 Abstract – Storeroom Cleaning The project that this report covers was undertaken at Samworth Brothers Manton Wood and was completed by Rowan Woodhead with the assistance of colleague apprentice Jack Bedford and Engineering Maintenance Manager Daniel Siddall. Verbal discussions were undertaken between all those involved to determine the best process in which to complete the planned activity. Whilst various ideas were put forward, all those involved agreed upon the storeroom being cleaned and reorganised to potentially allow for better stock flow. The outcome of the project is to have a storeroom that is easily managed, has all items on the stock inventory system and is not a risk to health and safety. Rowan Woodhead Engineering Project AMEDK3-004 Contents Page: 1) Introduction (Page 1) 2) Chapter 1: Initial Specification and Three Potential Solutions a. Brainstorm (Page 2) b. Logbook (Page 3) c. Flowchart (Page 4) d. Cost Analysis (Page 5) e. Pugh Matrix (Page 6) f. SWOT Analysis (Page 7) g. Justification for choice in solution (Page 7) 3) Chapter 2: Detail Design Specification a. Scope of the project (Page 8) b. Aims of the project (Pages 9, 10, 11) c. SMART Targets (Page 12) d. Implementation of the project (Page 13) e. Gantt Chart (Page 13) f. Cost Analysis (Page 14) g. Risk Assessment (Page 14) 4) Chapter 3: Implementation of the Project a. Preparations to the implementation of the project (Page 15) b. Work carried out for the project (Page 16)
[Show Less]