LINEAR PROGRAMMING MODELLING
CASE PROBLEM
Problem Statement
The Midland Tool Shop has four heavy presses it uses to stamp out prefabricated metal covers and housings for electronic consumer products. All four presses operate differently and are of different sizes. Currently the firm has a contract to produce three products. The contract calls for 400 units of product 1; 570 units of produ
...[Show More]
LINEAR PROGRAMMING MODELLING
CASE PROBLEM
Problem Statement
The Midland Tool Shop has four heavy presses it uses to stamp out prefabricated metal covers and housings for electronic consumer products. All four presses operate differently and are of different sizes. Currently the firm has a contract to produce three products. The contract calls for 400 units of product 1; 570 units of product 2; and 320 units of product 3. The time (in minutes) required for each product to be produced on each machine is as follows:
|
MACHINE
|
|
|
PRODUCT
|
1
|
2
|
3
|
4
|
|
1
|
35
|
41
|
34
|
39
|
|
2
|
40
|
36
|
32
|
43
|
|
3
|
38
|
37
|
33
|
40
|
Machine 1 is available for 150 hours, machine 2 for 240 hours, machine 3 for 200 hours, and machine 4 for 250 hours. The products also result in different profits, according to the machine they are produced on, because of time, waste, and operating cost. The profit per unit per machine for each product is summarized as follows:
[Show Less]